💧 Dive into Quality Water with Aquapro!
The Aquapro 69717 is a 9.5-inch long lead-free magnesium anode rod designed for MorFlo water heaters. With a 3/4 inch male pipe thread, it ensures a perfect fit while promoting safe and clean water. Weighing only 181.44 grams, this durable and compact solution is essential for maintaining your water heater's efficiency.
Manufacturer | Aquapro |
Item model number | 69717 |
Product Dimensions | 23.37 x 2.29 x 1.78 cm; 181.44 Grams |
ASIN | B0085IJLR2 |
A**M
Perfect fit !
Perfect fit and low price !
P**1
These are priced so well that I buy them and cut them down to replace other more expensive, smaller anodes.
What I love about this anode is that it's almost 10" long and cost's a fraction of the price of the actual anode I need that is 4" long. So I buy a few of these and cut them with a hack saw, and BOOM....fits perfectly for less than 1/2 price.FYI I use these on my marine water heater which requires 3/4" thread, magnesium anode rod.
W**Y
Worked great
It was of good quality and easy to install
B**.
Works fine.
Fits in the water heater just fine. Don't know how long it will last.
S**R
install
Install was easy and fit perfect
ترست بايلوت
منذ 5 أيام
منذ 3 أسابيع